Transmission rates cover the cost of moving energy from generating facilities to our customers. 夏延灯,燃料和电力传输 makes three (3) transmission rate filings each year.
CLFP现在有一个传输率公式. The formula rate and protocols currently in place were accepted by FERC, subject to further proceedings in ER19-697-000/ER19-41-000. At the conclusion of any additional proceedings, appropriate updated information will be provided.
报名接受通知 related to the annual transmission revenue requirement or annual true-up. 您可以随时退订.
年传输收入要求
年度传输收入要求, 或ATRR, 夏延光的估计收入是多少, 燃料与动力传输 (CLPT) must recover annually to cover costs associated with our transmission system. Below is a summary of protocols and schedules associated with the ATRR.
- 年传输收入要求 (ATRR): 夏延灯,燃料和电力传输 will determine and post the ATRR for the following service year on or before Sept. 每年30人.
- Notifications: Within ten (10) days of posting 夏延灯,燃料和电力传输 will provide notice to interested parties by email exploder which can be subscribed to on the Black Hills Basin Electric website.
- Open meeting for interested parties: An open meeting will be held each year by Oct. 解释和澄清ATRR, and provide interested parties an opportunity to seek information and clarifications about the ATRR.
- Information exchange procedures: Interested parties have until Nov. 30 to serve reasonable information and document requests. 请求仅限于中标识的项目 附件H. Cheyenne Light, Fuel and Power Transmission will respond by Dec. 31.
- 质疑程序:有兴趣的人可以在1月6日之前提出质疑. 15 to notify us, in writing, of any specific informal challenges to the ATRR. 通知可能是 通过电子邮件发送给传输服务. 夏延灯,燃料和电力传输 will respond to informal challenges by February 15th. Interested parties have until April 1 to make a formal challenge with FERC and simultaneously serve 夏延灯,燃料和电力传输. Formal challenges must satisfy all requirements set forth in 附件H.
申请
2025年预计净收入需求
- 2025 CLPT附H Trans公式投影 (XLSX)
- 2025最终兆瓦率CLFP (XLSX)
- 2025 CLPT附件H补充工作文件 (XLSX)
- 8提前支付 (XLSX)
- FERC表格1 pg 429 (PDF)
- 2025年CLFP ATRR项目会议通知 (PDF)
2024年预计净收入需求:
- 2024 CLFP Projected Net Revenue Requirement Presentation (PDF)
- 2024 CLPT ATRR会议通知.26.23 (PDF)
- 20024 CLPT附件H和附表1 MW费率01.01.2024 to 12.31.2024 (XLSX)
- 2024 CLPT附H Trans公式投影 (XLSX)
- 2024 CLPT附件H补充工作文件 (XLSX)
- 2024 CLPT A-8提前付款 (XLSX)
- CLPT FERC表格1 pg 429 (PDF)
2023年预计净收入需求:
- 2023 CLFP Projected Net Revenue Requirement Presentation (PDF)
- 2023 CLPT ATRR会议通知10-25-22 (PDF)
- 2023最终兆瓦率CLFP (xlsx)
- 2023 CLPT附H Trans公式投影 (xlsx)
2022年预计净收入需求:
- 2022 Attach H and Schedule 1 MW Rates 1-1-22 to 12-31-22
- 2022 CLPT附H Trans公式投影
- 2022 CLPT Annual Transmission Revenue Requirement Meeting Notice 10-27-21 (pdf)
- 2022 CLFP Projected Net Revenue Requirement Presentation 10-27-21 (pdf)
2021年预计净收入需求:
- 2021 Attach H and Schedule 1 MW Rates 1-1-21 to 12-31-21 (xlsx)
- 2021 CLPT附加H Trans公式投影 (xlsx)
- 2021 Annual Transmission Revenue Requirement Meeting Notice CLPT 10-22-20 (pdf)
- 2021 CLFP Projected Net Revenue Requirement Presentation 10-22-2020 (pdf)
2020年预计净收入需求:
- 2020_projected_net_revenue_requirement_presentation_102119.pptx
- 2020 Annual Transmission Revenue Requirement Meeting Notice CLPT
- 2020 CLPT 附件H Transmission Formula Rate estimate - V2
信息文件
The informational filing is a summary of the previous year’s ATRR requirement and annual true-up. Cheyenne Light, Fuel and Power Transmission will submit the filing by March 1.
申请
2024信息档案编号. ER24-1355-000
- 补充2024 - CLFP信息提交最终
- 2022 CLFP信息成本分配
- 2022年CLFP预付费会计报告摘要
- 2022 CLPT附件H补充工作文件
- 2022 CLPT附件H反式公式率True Up
- 2024 CLPT附件H补充工作文件
- 2024 CLPT附H Trans公式投影
2023资料档案编号. ER23-1187-000
2022信息档案编号. ER22-1126-000
2020年信息档案摘要号. ER21-1232-000
2019年信息档案摘要号. ER20-1115-000:
- 2020 CLPT 附件H Transmission Formula Rate estimate - V2
- 2020 CLPT 附件H Transmission Formula Rate estimate (003)
- 2020 - 02年- 27 - _clfp_informational_filing_final
- 夏延灯2018年FERC表格的相关页面1
年度调准
The annual true-up is a calculation of the actual net revenue requirement costs versus the estimated costs 夏延灯,燃料和电力传输 charged for the previous year. 附表2也将有一个truup. At the same time 夏延灯,燃料和电力传输 will calculate the Schedule 1 rate effective Jan.1. Below is a summary of protocols and schedules associated with the annual true-up and Schedule 1:
- Annual True Up: 夏延灯,燃料和电力传输 will determine and post the actual transmission costs for the prior year compared to the projected ATRR and do a true up by June 1. Customers will be issued a refund or surcharge including interest.
- Notifications: Within ten (10) days of posting 夏延灯,燃料和电力传输 will provide notice to interested parties by email which can be subscribed to on the Black Hills Basin Electric website.
- Open meeting for interested parties: An open meeting will be held each year by July 1 to explain and clarify the annual true-up and provide interested parties an opportunity to seek information and clarifications about the annual true-up.
- Information exchange procedures: Interested parties have until Aug. 1 .银河官网网址提供合理的信息和文件要求. 请求仅限于中标识的项目 附件H. 夏延灯,燃料和电力传输 will respond by Sept. 1.
- Challenge procedures: interested parties have until Sept. 15 to notify us, in writing, of any specific informal challenges to the Annual True-Up. 通知可能是 通过电子邮件发送给传输服务. 夏延灯,燃料和电力传输 will respond to informal challenges by Oct. 15. Interested parties have until April 1 to make a formal challenge with FERC and simultaneously serve 夏延灯,燃料和电力传输. Formal challenges must satisfy all requirements set forth in 附件H.
申请
2023公式率正确
- 2023 CLPT附件H补充工作文件 (XLSX)
- 2023 CLPT附件H反式公式率正确 (XLSX)
- 8提前支付 (XLSX)
- FERC表格1 pg 429 (PDF)
- 2023年CLFP真实会议通知 (PDF)
- 2023夏安灯真亮演示 (PDF)
2022年公式费率真实
- 2022夏安灯真正的展示 (PDF)
- 2022年CLFP真实会议通知 (PDF)
- 2022 CLPT附件H补充工作文件 (XLSX)
- 2022 CLPT附件H反式公式率True Up (XLSX)
- 8提前支付 (XLSX)
- FERC表格1 pg 429 (PDF)
2021年公式费率调整
2020年公式费率调整
2019年公式率正确
- 2020年CLPT附表1费率预测6-1-20至12-31-20
- 2019年CLPT附件H反式配方率上调
- 2020 CLPT附H Trans公式率预测
- BHSC折旧调整
- 2019年CLFP年度例会通知
- 2019年CLFP公式率真实上升演示
更多的信息
Find information regarding our transmission formula on OASIS.
Information on our transmission formula rate calculation and proposed protocols can be found under 附件H 的联合开放接入传输关税 FERC的网站.
报名接受通知 related to the annual transmission revenue requirement or annual true-up. 您可以随时退订.